Reservoir Operation by Variable Restricted Water Level during Flood Period

홍수기중 가변제한수위에 의한 저수지 운영

  • 심명필 (인하대학교 토목공학과) ;
  • 권오익 (인하대학교 대학원 토목공학과 박사과정, 한국수자원공사 관리본부 설계관리실장) ;
  • 이환기
  • Published : 1995.12.01

Abstract

For optimal reservoir operation during flood period, a general and systematic policy is suggested to make balance of the conflicting purposes between water conservation and flood control. The purpose of this study is to decide the restricted water level of the reservoir during flood period specially to meet water demand in non-flood period. The optimal policy is derived by reallocation of storage capacity through the application of variable restricted water level(VRWL) and minimum required water level(MRWL) for shorter intervals. This study also suggests water level dconditions to secure conservation storage capacity at the end of the flood period estimated by reservoir operation study. This paper illustrates an application of the Daecheong Dam and Chungju Dam respectively during flood and the results are reviewed.

홍수기중 최적의 저수지운영을 위해 서로 상반되는 이수와 치수를 조화시키기 위한 전반적이고 체계적인 운영방안을 제안하였다. 본 연구는 비홍수기의 용수수요 보장을 고려히 홍수기중 저수지의 제한수위를 결정하기 위한 것이다. 단기간별요 가변제한수위(VRWL)와 최소 확보저수위 (MRWL)를 적용하여 저수용량의 재할당으로 최적 운영방안이 유도되었다. 또한 갈수빈도해석에 따른 저수지운영분석으로 비홍수기의 용수공급을 위해 확보되어야 할 홍수기말 저수지의 수위조건에 관하여 대청과 충주 다목적댐을 대상으로 적용하고 그 결과를 분석하였다.

Keywords

References

  1. 수자원공학 권오헌
  2. 다목적댐의 건설-제 2권 조사편
  3. 다목적댐의 홍수조절을 위한 예비방류 대책 연구
  4. 다목적댐 운영 실무편람
  5. 댐시설기준
  6. 대한토목학회논문집 v.12 no.3 위험도제약 선형계획법에 의한 홍수기 저수지 운영 이길성;강부식
  7. 공업수문학 윤용남
  8. 충주댐지점 갈수분석 및 신뢰도별 필요확보저수량
  9. 한강수계 충주저수지 시스템의 실시간 최적운영을 위한 의사결정수지 시스템개발(이수관리부문);92-WR-3-1
  10. HEC-5 simulation of flood and conservation systems, users manual Hydrologic Engineering Center
  11. Development in Water Science v.33 Water management in reservoirs Votruba,L.
  12. Technical Report no.137 Optimum reservoir for flood control and conservation purposes Wurbs,R.A.;Cabezas,L.M.;Tibbets,M.N.