In this study, the discharge capacities of an existing dam was reviewed based on probable maximum precipitation (PMP). First of all, the rating curve which relates water level with discharge beyond the design flood was modified based on hydraulic aspects. It is need to consider two factors such as saddle dam which was constructed with rock and fill(core level : EL. 198.5 m) and spillway gates which must not be conflicted with discharge flow (requirement level : EL. 197.7 m). As the results, $6{\sim}9$ extra outlets can meet with above requirements and conditions according to target and initial water levels, respectively.

본 연구에서는 기존댐을 대상으로 가능최대강수량(PMP)이 해당유역에 발생할 경우 방류능력을 검토하였다. 우선적으로 설계홍수량보다 매우 큰 홍수량에 대하여 월류부에서의 수리학적 검토를 통하여 수위-방류량에 대한 검정을 실시하였다. 상류에 필댐형식으로 축조된 부댐(코아 마루 EL. 198.5 m)을 초과하지 않고, 월류수맥이 여수로 수문하단에 충돌하지 않도록(EL. 197.7 m) 비상방류구를 설치하는 방안에 대해서 검토한 결과, 초기수위와 목표수위에 따라 비상방류구가 $6{\sim}9$개가 필요한 것으로 검토되었다.

Keywords

References

  1. 댐설계기준 건설교통부
  2. 1999년도 수자원관리기법개발연구조사 보고서, 제 2권, 한국 가능최대강수량도 추정 건설교통부
  3. 수리학 -기초와 응용- 윤용남
  4. 1999년 8월 임진강 유역 대홍수, 건기연 99-034 한국건설기술연구원
  5. 2002년 태풍 루사에 의한 강원도지역 대홍수 한국건설기술연구원
  6. 제 2회 재해관리기술세미나 2002 풍수해 특성과 재해대책 한국방재협회
  7. Gated Spillways and Other Controlled Release Facilities, and Dam Safety, Question 79, Commission. Cassidy, J.J.
  8. Journal of Hydraulic Engineering v.114 no.11 Plan gate on standard spillway Hager, W.H.;Bremen, R.
  9. Nonstructural Risk Reduction Measures-Benefits and Costs for Dams, Bulletin E02 ICOLD
  10. Hydraulic Structures Sinniger, R.O.;Hager, W.H.
  11. Dam Hydraulics Visher, D.L.;Hager, W.H.