Abstract
This study is to present appropriate approaches to estimate construction costs and operating and maintenance costs (O & M costs) for WWTP(wastewater treatment plant). The relationships between capacity and O & M costs of WWTP were analyzed. Cost data on 58 common types of plants were collected for construction costs and those on 122 plants were used for O & M costs. Activated sludge process, oxidation ditch process, $A_2O$ process, and SBR process were included. Construction costs by methods were estimated in the following order: SBR < activated sludge < $A_2O$ < oxidation ditch. The function of WWTP construction costs for overall methods was $C\;=\;94.39\;Q^{0.568}$. The relationship between the capacity and O & M costs was as follows : $C\; =\; 0.222\;Q^{0.964}$, where, C is construction cost $(10^6\; won)$, Q is capacity(ton/day).
본 연구는 하수처리시설의 적정한 건설비용과 유지관리비용 산정방안을 모색함에 그 목적이 있다. 하수처리장의 시설용량에 따른 건설비용과 유지관리비용간의 관계식을 분석하였다. 하수처리장 건설비용 산정을 위해 58개 시설의 비용자료를 검토하였으며, 122개 처리시설의 유지관리 비용자료를 대상으로 하였다. 검토 대상 처리공법으로는 표준활성슬러지법, 산화구법, $A_2O$, SBR 등을 대상으로 하였다. 분석 결과, 하수처리시설의 건설비용은 SBR < 표준활성슬러지 계열 < $A_2O$ < 산화구 계열의 순서로 나타났다. 공법을 구분하지 않을 경우 건설비용과 유지관리비용의 함수식은 각각 $C\;=\;94.39\;Q^{0.568}$와 $C\; =\; 0.222\;Q^{0.964}$로 산출되었다. 여기서, C는 비용(백만원)이며, Q는 용량(ton/day)이다.