A Study on Dynamic Scheduling in Flexible Manufacturing System Environment

유연생산시스템 환경 하에서의 동적 일정계획에 관한 연구

  • 이상완 (동아대학교 산업경영공학과) ;
  • 김해식 (동아대학교 산업경영공학과) ;
  • 조성열 (동아대학교 산업경영공학과)
  • Published : 2004.06.01

Abstract

Changes in manufacturing system are those that occur during production and cause the systems to behave unpredictably. So scheduling problem in this dynamic Industrial environments is very complex. The main concept of this dissertation is to continuously monitor a manufacturing system status(Rate of Prior Job, Rate of Large Job, Rate of Shortest due date Job, Job Interval Time) and detect or predict a change so that scheduling system will react by modifying production schedule(dispaching rule) to lessen the effects of this change.

Keywords

References

  1. I. Sabuncuoglu, 'A study of scheduling rules of flexible manufacturing systems : a simulation approach', International Journal of Production Research, 36-2, pp 527-546, 1998
  2. M. Montazeri, L,N. Van Wassenhove, 'Analysis of scheduling rules for an FMS.' International Journal of Production Research, 28-4, pp785-802, 1990
  3. P.J. Egbelu and J.K.A. Tanchoco, 'Characterization of Automated Auided Vehicle Dispatching Rules', International Journal of Production Research, .22, pp 359-374, 1984
  4. W. L. Maxwell and J. A. Muckstadt, 'Design of automated auided vehicles', IIE Transactions, 14, pp114-124, 1982
  5. R. J. Gaskins and J.M.A. Tanchoco, 'AGVSim2 - A development tool for AGVs controller design', International Journal of Production Research, 27-.6, pp 915-926, 1989
  6. P. Solot, 'A concept for planning and scheduling in an FMS', European Journal of Operational Research, .45, pp.85-95, 1990
  7. Ishii, N and Talavage, J,J. 'A transient-based real-time scheduling algorithm in FMS', International Journal of Production Research, 29-12, 2501-2520, 1991
  8. K. Shanker and Y. J. J. Tzen, 'A loading and dispatching problem in a random flexible manufacturing system,' International Journal of Production Research, 23-3, pp.579-595, 1985
  9. M. C. Gupta, Y. P. Gupta and G. W. Evans, 'Operations planning and scheduling problems in advanced manufacturing systems', International Journal of Production Research, 31-4, pp.869-900, 1993
  10. Davis R. Bothe, 'Measuring Process Capability', McGraw-Hill, 1997
  11. M.Montazer and L. N. Van Wassenhove, ' Analysis of scheduling rules for an FMS', International Journal of Production Research, 28-4, pp785-802, 1990
  12. Gino Cardarelli, 'Comparison of coventional and dynamic FMS periodic loading rules', integrated Manufacturing Systems, 9-1, pp15-22, 1998