A Study On Operation Method of Handling Equipments in Automated Container Terminals

자동화 컨테이너터미널에서 운송장비의 운영방안에 관한 연구

  • Choi, Hyung-Rim (Department of Management Information Systems, Dong-A University) ;
  • Park, Nam-Kyu (Department of Distribution Management, Tongmyung University of Information and Technology) ;
  • Park, Byung-Joo (Department of Management Information Systems, Dong-A University) ;
  • Kwon, Hae-Kyung (Department of Port & Logistics Systems, Dong-A University) ;
  • Yoo, Dong-Ho (Department of Management Information Systems, Dong-A University)
  • 최형림 (동아대학교 경영정보학과) ;
  • 박남규 (동명정보대학교 유통경영학과) ;
  • 박병주 (동아대학교 경영정보학과) ;
  • 권해경 (동아대학교 항만물류시스템학과) ;
  • 유동호 (동아대학교 경영정보학과)
  • Received : 2003.04.28
  • Accepted : 2004.05.24
  • Published : 2004.06.30

Abstract

The main subject to become a hub port is automation. The automated container terminal has already operated in advanced ports and it has been planned for the basic planning and operation design in domestic case. The key of automated container terminal is effective operation of both ATC(automated transfer crane) and AGV(automated guided vehicle) which is automated handling equipments. This is essential to productivity of automated container terminal. This study suggests the most optimal method of equipment operation in order to minimize loading time using each three types of effective ATC operation methods and AGV dispatching rules in automated container terminals. As the automated equipment operation causes unexpected deadlocks or interferences, it should be proceeded on event-based real time. Therefore we propose the most effective ATC operation methods and AGV dispatching rules in this paper. The various states occurred in real automated container terminals are simulated to evaluate these methods. This experiment will show the most robust automated equipment operation method on various parameters(the degree of yard re-marshaling, the number of containers and AGV)

Keywords

References

  1. 한국해양수산개발원 (2001), 광양항 3단계 자동화 컨테이너터미널 개발기본계획
  2. Kim, K.H. and Kim,K.Y. (1997), A Routing Algorithm for a Single Transfer Crane to .Load Export Containers onto a Containership, Computers ind. Engng, 33(3-4), 673-679
  3. Kim, K.H. and Kim, K.Y. (1999), An Optimal Routing Algorithm for a Transfer Crane in Port Container Terminals, Transportation Science, 33(1), 17-33
  4. Chen, Y., Leong., T.Y., Ng, J.W.c., Demit, E.X., Nelso, B.L. and Simchilevi, D. (1998), Dispatching automated guided vehicles in a mega container terminal, paper presented at INFORMS, Montreal, Canada
  5. Kim, K.H. and Bae, J.W. (1999), A dispatching method for automated guided vehicles to minimize delays of containership operation, International Journal of Management Science, 5(1), 1-25
  6. Meermans, P.J.A. and wagelmans, A.P.M. (2001), Report series research in management-Effective algorithms for integrated scheduling of handling equipment at automated container terminals, 1-20, Erasmus Research Institute of Management
  7. Meermans, P.J.A. and wagelmans, A.P.M. (2001), Dynamic scheduling of handling equipment at automated container terminals, Report series research in management, ERASMUS Research Institute of Management, 1-26
  8. Duinkerken, M.D., Evers, J.J.M. and Otrjes, J.A. (2001), A simulation Model for Integrating Quay Transport and Stacking Policies on Automated Container Terminals, Proceeding of the 15th European Simulation Multiconference, June