Simulation based Productivity Analysis for NATM Operations

시뮬레이션 모델링을 통한 NATM 터널공정 생산성 향상 분석

Chun, Jin-Yong;So, Byoung-Gak;Choo, Jang-Sik;Woo, Sung-Kwon
천진용;소병각;추장식;우성권

  • Published : 2005.05.31

Abstract

The application of simulation method has been very limited in construction industry due to the difficulties in data collection and model development in spite of its positive effects like improvements in efficiency and productivity. This research presents a simulation model for the process for the NATM tunneling process which are repeated and continuously executed during the construction. Each processes, as well as the whole tunneling process, has been modeled. This research also shows that meaningful productivity improvement could be obtained from the process improvement as a result of simulation analysis by comparing the tunneling process suggested from the simulation analysis with the actual tunneling process data.

시뮬레이션 기법은 작업 생산성 및 효율성의 향상 등과 같은 많은 장점을 가지고 있음에도 불구하고, 시뮬레이션 모델의 구축 및 데이터 수집의 어려움 등으로 인하여 건설사업에 있어서의 활용은 매우 제한적이었다. 본 연구는 일정 공정이 계속적으로 반복 수행되는 NATM 공정을 대상으로 천공발파, 버력처리, 쇼크리트, 락 볼트의 개별 공정들과 이들을 포괄하는 전 공정에 대한 시뮬레이션 모델을 개발 제시하고, 버력처리 공정을 중심으로 실제 터널공사의 수행데이터에 적용한 결과를 공기 측면에서 비교함으로써, 시뮬레이션 기법의 적용으로 건설공정의 생산성 향상 효과를 기대할 수 있다는 사실을 보여준다.

Keywords

References

  1. 건설교통부(2000) 도로설계편람, 건설기술연구원
  2. 김경주(2000) 건설공정 시뮬레이션을 위한 독립 자원모델 구축방안 연구, 대한토목학회논문집, 제20권, 제4D호, pp. 389-402
  3. 김경주(2000) 여객기 터미널 포장 공정의 생산성 향상을 위한 불연속 사건 시뮬레이션 적용연구, 대한토목학회논문집, 제20권, 제4D호, pp. 403-412
  4. Chua, D.K.H. and Li, G.M. (2002) Resource-Interacted Simulation Modeling in Construction. J. Constr. Engrg. and Mgmt., ASCE, Vol. 128. No 3, pp. 195-203 https://doi.org/10.1061/(ASCE)0733-9364(2002)128:3(195)
  5. Halpin, D.W. and Martinez, L.-H. (1996) Real World Applications Of Construction Process Simulation. Proceedings of the 1996 Winter Simulation Conference, pp. 956-962
  6. Halpin, D.W., and Riggs, L.S. (1992) Planning and Analysis of Construction Operations, John Wiley & Sons, Inc., New York, N.Y.
  7. Han, S.-W. and Lee, S.-Y. (2003) Quantified Benefit of GPS in Earthmoving Operation. Journal of civil Engneering, KSCE, Vol 7 No. 5, pp.489-497 https://doi.org/10.1007/BF02838315
  8. Martinez, J., Photios, G. and Ioannou, A.M. (1995) Evaluation of Alternative Construction Process Using Simulation. Proceedings, Construction Congress 95, ASCE, pp. 22-26
  9. Martinez, J., Photios, G. and Ioannou, A.M. (1996). Simulation of Complex construction Process. 1996 Winter Simulation Conference, pp.1024-103
  10. Martinez, J., Photios, G. and Ioannou, A.M. (1999) General-Purpose Systems for Effective Construction Simulation. J. Constr. Engrg. and Mgmt., ASCE, Vol. 125. No 4, pp.265-276 https://doi.org/10.1061/(ASCE)0733-9364(1999)125:4(265)
  11. Oloufa, A.A. (1993) Modeling of building construction activities using forms. Proceedings of ISARC, Houston, pp. 237-244
  12. Shannon, R. E. (1975) System Simulation : The Art and Science, Prentice Hall, Englewood Cliffs, N.J.
  13. Touran, A. (1990) Integration of simulation with expert systems. J. Constr. Engrg. and Mgmt., ASCE, Vol. 116. No. 3, pp. 480-493 https://doi.org/10.1061/(ASCE)0733-9364(1990)116:3(480)