DOI QR코드

DOI QR Code

A framework of Plant Simulation for a Construction of a Digital Shipyard

디지털 조선소 구축을 위한 물류 모델 프레임워크

  • Woo, Jong-Hun (Seoul National University, Naval Architect and Ocean Engineering) ;
  • Lee, Kwang-Kook (Seoul National University, Naval Architect and Ocean Engineering) ;
  • Jung, Ho-Rim (Hong Ik University, Mechanical Engineering) ;
  • Kwon, Young-Dae (Samsung Heavy Industry, Geoje Shipyard, Information System) ;
  • Shin, Jong-Gye (Seoul National University, Naval Architect and Ocean Engineering)
  • 우종훈 (서울대학교 조선해양공학과) ;
  • 이광국 (서울대학교 조선해양공학과) ;
  • 정호림 (홍익대학교 기계공학부) ;
  • 권영대 (삼성중공업 조선사업부 정보시스템) ;
  • 신종계 (서울대학교 조선해양공학과)
  • Published : 2005.04.01

Abstract

Recently, world leading companies on manufacturing field are trying to adopt a PLM methodology, which is a new production paradigm, for a survival and strengthening the competitiveness. Some projects for a digital shipyard including a methodology of a digital simulation framework are going on by Seoul national university and Samsung heavy industry. A Database methodology for a scheduling data, an interfacing methodology for a simulation input and output, and a synchronized simulation related methodology are required for enhancing the value of the digital simulation for shipbuilding. In this paper, such a methodologies and a related case study for a fabrication factory and an assembly factory are presented.

Keywords

References

  1. 신종계, 2001, Introduction to Digital Shipbuilding 한국 CAD/CAM 학회 Workshop 자료집 , 한국 CAD/CAM 학회, pp. 299-340
  2. 신종계, 이장현, 우종훈, 2001, '디지털 선박생산 (Digital Shipbuilding) 개념', 대한조선학회논문집, 제 38 권, 제 1 호, pp. 54-62
  3. 정호림, 2004, 디지털 매뉴팩쳐링 기법을 이용한 조선소 내 단위공장의 디지털 통합 모델 구축, 홍익대학교 기계공학과 석사 학위 논문
  4. 홍지수, 2003, 'e-Manufacturing in Automotive Accenture Point of View', 2003 DELMIA Korea User Conference, Accenture
  5. IBM 2003, PLM Network vol.18, pp. 5-6
  6. Shin, J.G., 2002, 'An Object-Oriented Production Process Modeling and Simulation of Shipyard Fabrication Shop in a Virtual Environment,' Proceedings of the 2002 Ship Production Symposium, SNAME, Boston USA
  7. Shin, J.G., Lee, K.K., Woo, J. H., Lee, J.H. and Kim, S.H., 2003, 'A Modeling and Simulation of Production Process at a Shipyard,' COMPIT (Computer Applications and Information Technology in the Maritime Industries), Hamburg university Germany, pp. 55-69
  8. Thomas L., Chung, H., Mark S., Shin, J.G., Woo, J.H. and Phillip K., 2003, 'Simulation-based Performance Improvement for Shipbuilding Processes,' Proceedings of the 2003 Ship Production Symposium, SNAME, San Francisco USA

Cited by

  1. Design and Development of Scenario-Based Simulation System to Improve Shipbuilding Execution Scheduling Assessment -A Case Study on Panel Line- vol.18, pp.3, 2013, https://doi.org/10.7315/CADCAM.2013.211
  2. Study on Simulation Model Generation of a Shipyard Panel Block Shop using a Neutral Data Format for Production Information vol.50, pp.5, 2013, https://doi.org/10.3744/SNAK.2013.50.5.314
  3. Study on a process-centric modeling methodology for virtual manufacturing of ships and offshore structures in shipyards vol.71, pp.1-4, 2014, https://doi.org/10.1007/s00170-013-5498-4