A Case Study on Assembly Block Operations Management at Shipyard

조선 조립블록 운영관리에 관한 사례연구

  • 박창규 (울산대학교 경영대학 경영학부) ;
  • 서준용 (울산대학교 경영대학 경영학부)
  • Published : 2006.11.30

Abstract

How to efficiently manage assembly blocks at shipyard has been a hot management issue in the shipbuilding Industry, because it has significantly influenced on the productivity of shipbuilding process. This paper introduces the real practice of assembly block operations management in Hyundai Heavy Industries (HHI) and the Ship Assembly Block Operations Optimization (SABOO) project that h3s been launched in HHI as an academy-and-industry collaborative project, aimed to diagnose problems, propose possible solutions, and develop a prototype system in order to search ways of improving the assembly block operations management. Through the field interviews, observations, and benchmarking studies, the SABOO project diagnosed the most rudimental and urgent problem and proposed possible solutions. In addition, the SABOO project developed the prototype system that embodied the visual function of monitoring the shipyard on a real-time and the Interactive block assignment function that utilized the assembly block assignment algorithm developed by the project. As a whole, the SABOO project tested the possibility and gained an insight in extending the functions of block transportation/stockyard management system.

Keywords

References

  1. 권시택, 'SCM이론과 TOC이론을 적용한 조선산업의 물류개선 방안에 관한 연구', 울산대학교 석사논문, 1999
  2. 김승우, 윤운락, '현대중공업 물류시스템 개선을 위한 마스터 플랜', 현대경제 사회연구원, 1996
  3. 김익수, '조선산업에서의 조립공정의 물류개선방안에 관한 연구', 울산대학교 석사논문, 2004
  4. 김종기, '조선산업에서 블록 적체현상 해소방안에 대한 연구', 울산대학교 석사논문, 2003
  5. 박 양, '조선산업에서의 블록적체 해소를 위한 대형블록 조립탑재 방법에 관한 연구', 울산대학교 석사논문, 2005
  6. 안상식, '조선소에서 블록 적치장의 효율적 운영방안에 관한 연구', 울산대학교 석사논문, 2002
  7. Michalko, M., Thinkertoys:a Handbook of Business Creativity for the 90's, Ten Speed Press, New York, 1991
  8. Storch, R.L., C.P. Hammon, H.M. Bunch, and R.C. Moore, Ship Production, Cornell Maritime Press, Maryland, 1995
  9. Park, C., K.H. Chung, J.C. Park, K.K. Cho, T.H. Baek, and E.I. Son, 'A Spatial Scheduling Application at the Block Paint Shop in Shipbuilding:the HYPOS Project,' Production Planning & Control, Vol.13, No.4 (2002), pp.342-354 https://doi.org/10.1080/095372802760108309
  10. Park, C., J. Seo, J. Kim, S. Lee, T. Baek and S. Min, 'Assembly Block Storage Location Assignment at Shipyard:a Case of Hyundai Heavy Industries,' Production Planning & Control, to appear