Economic Evaluation for Road Pavement Maintenance by using HDM

HDM을 활용한 국도 포장 유지보수 공법에 대한 경제성 평가

Do, Myung-Sik;Han, Dae-Seok;Lee, Jong-Dal;Lee, Young-Uk
도명식;한대석;이종달;이영욱

  • Published : 20070500

Abstract

In Korea, the superpave (e.g. stone mastic asphalt) was first introduced in the mid-1990s in order to set up countermeasures against rutting on national roads. This paper aims at suggesting an efficient maintenance policy minimizing expected life cycle cost considering traffic volume in future and the uncertainty in the degradation process of the pavement. Also the pavement deterioration models incorporated in HDM-4(Highway Development & Management-4) which is being used worldwide have been calibrated and adapted to local conditions. We use the observed data, such as rut-depth, crack and roughness for development of deterioration forecast models. Based on calibration result of HDM-4, the economic evaluation including road agency cost and user cost is performed for 22 road sections. Also we try to investigate performance and economic efficiency between superpave and conventional hot-mix asphalt(HMA) on national highway. As a result of the analysis of serviceability for 40 years, superpave was found to have higher resistance against rutting and cracking than HMA in most road sections.

Keywords

References

  1. 건설교통부(2003) 2003 도로교통량 통계연보
  2. 건설교통부(2005) 2004 도로포장관리시스템 최종보고서, 건설기술 연구원
  3. 남영국(2004) 도로포장공학, 구미서관
  4. 도벙식, 한대석, 유인균, 이수형(2006) LCC를 고려한 내유동포장의 공용성 및 경제성 분석에 관한 연구, 대한토목학회논문집, 대한토목학회, 제26권 제5D호, pp. 783-796
  5. 최민수 외(1999) 건설사업의 LCC분석기법 및 적용방안, 한국건설산업연구원
  6. 한국건설기술연구원(2001) 슈퍼팔트(SBS PMA)의 현장공용성 조사 및 경제성분석 연구 최종보고서
  7. 한국건설기술연구원(2003) 2002 도로포장관리시스템 연구보고서
  8. 한국건설기술연구원(2005) 2004 도로포장관리시스템 최종보고서
  9. Bennett, C.R. (2000) HDM-4 Manual Vol. 7. Modelling Road User and Environmental Effects in HDM-4, PIARC
  10. Bennett, C.R. and Paterson, W.D.O. (2000) HDM-4 Mannual Vol. 5, A Guide to Calibration and Adaptation , PIARC
  11. Hass, R. and Hudson, W.R. (1988) Pavement Management Systems
  12. Hudson, W.R., Hass, R., and Uddin, W. (1997) Infrastructure Management, McGraw-Hill
  13. Kerali, H.G.R. (2000) HDM-4 Manual Vol. 1, Overview of HDM-4, PIARC
  14. Lerner, A.C. (2004) Public Benefit of Highway System Preservation and Maintenance, NCHRP SYNTHESIS 330, TRB, pp. 313
  15. Okubo, K., Sato, M., and Xing, J. (2003) Adapting the HDM-4 to Expressways in Japan
  16. Peshkin, D.G., Hoerner, T.E., and Zimmerman, K.A. (2004) Optimal Timing of Pavement Preventive Maintenance Treatment Applications, NCHRP Report 523, TRB
  17. Tsunokawa, K. and Ul-Islam, R. (2003) Optimal Pavement Design and Maintenance Strategy for Developing Countries: An Analysis using HDM-4, The Intl. J. of Pavement Engrg., Vol. 4, No. 4. pp. 193-208 https://doi.org/10.1080/10298430410001661437