Practical Model to Estimate Road User Cost for Bridge Maintenance Strategy

교량 유지관리 전략 수립을 위한 실용적 도로이용자비용 추정 모델

  • Received : 2006.12.08
  • Published : 2007.11.30

Abstract

The road user cost in indirect costs as well as direct costs such as the inspection/ diagnosis cost and the repair/reinforcement cost should be considered as one of the important items in the life-cycle cost-effective design and maintenance of the bridges. To estimate the road user cost, this paper formulates the road user cost as a sum of the user delay cost and the vehicle operating cost considering the detour effect. A numerical traffic simulation and a regression analysis are performed to develop a regression model due to a time delay. The proposed regression model is applied to the generation of the maintenance strategy based on the life-cycle cost and performance, and its effectiveness and applicability is investigated. The road user cost has a great influence on establishing the maintenance strategy, and the proposed regression model could be successfully utilized to estimate the road user cost of a bridge.

생애주기비용을 고려한 교량의 설계 및 유지관리에 있어서, 점검진단, 보수보강 등에 소요되는 직접적인 비용뿐만 아니라 간접적인 비용인 도로이용자비용은 중요한 비용항목으로 고려되고 있다. 직접비용과 비교하여 상대적으로 추정이 곤란한 도로이용자비용의 추정을 위하여 우회도로의 효과를 고려한 이용자지연비용과 차량운행비용의 정식화를 수행하고, 시간지체에 따른 도로이용자비용의 추정을 위한 회귀모델 개발을 위하여 교통해석과 회귀분석을 수행하였다. 개발된 회귀모델을 생애주기 비용 및 성능 기반 유지관리 전략 수립에 적용하여 도로이용자비용이 생애주기분석에 미치는 영향을 분석하고, 개발된 모델의 적용성에 대해서 고찰하였다. 도로이용자비용은 생애주기분석에 기초한 유지관리전략수립에 큰 영향을 미치며, 개발된 회귀모델은 교량의 도로이용자비용의 추정에 실용적으로 활용될 수 있을 것으로 판단된다.

Keywords

References

  1. 박경훈, 이상윤, 황윤국, 공정식, 임종권, "생애주기비용을 고려한 성능기반 교량 최적 유지관리 전략 수립 시스템 개발", 한국구조물진단학회 논문집, 11권, 4호, 2007, pp. 109-120.
  2. 한국건설기술연구원, "강교량의 최적설계 및 경제적 유지관리를 위한 Life Cycle Cost 분석기법 및 시스템 개발", 건설교통부/한국건설기술교통평가원, 2006. 5.
  3. Berthelot, C. F., Sparks, G. A., Blomme, T., Kajner, L. and Nickeson, M., "Mechanistic -probabilistic vehicle operating cost model", J. of Transportation Engineering, ASCE, 122(5), 1996, pp. 337-341. https://doi.org/10.1061/(ASCE)0733-947X(1996)122:5(337)
  4. Chien, S. and Schonfeld, P., "Optimal work zone lengths for two-lane highways", J. of Transportation Engineering, ASCE, 128(2), 2002, pp. 145-155. https://doi.org/10.1061/(ASCE)0733-947X(2002)128:2(145)
  5. Ehlen, M. A. and Marshall, H. E., "The economic of new technology materials: a case study of FRP bridge decking", NIST, 1996.
  6. EMME/2, "EMME/2 User's Manual, Software Release 9.0", Inro Consultants Inc., Montreal, Canada, 1999.
  7. Hawk, H, "Bridge Life Cycle Cost Analysis - Final Report", NCHRP Project 12-43, National Cooperative Highway Research Program, 2002.
  8. Jiang, X. and Adeli, H., "Freeway work zone traffic delay and cost optimization model", J. of Transportation Engineering, 129(3), 2003, pp. 230-241. https://doi.org/10.1061/(ASCE)0733-947X(2003)129:3(230)
  9. Kong, J. S. and Frangopol, D. M., "Cost- reliability interaction in life-cycle cost optimization of deteriorating structures", J. of Structural Engineering, 130(11), 2004, pp. 1704-1712. https://doi.org/10.1061/(ASCE)0733-9445(2004)130:11(1704)