Change in Road Traffic Demand after the Operation of Exclusive Median Bus Lane in Seoul

서울시 중앙버스전용차로 시행에 따른 도로교통 수요 변화

  • 윤병조 (시립인천전문대학 토목과)
  • Published : 2008.09.15

Abstract

8 Exclusive Median Bus Lanes(EMBL) are operated in Seoul metropolitan city after the opening of Chon-ho section in 1996. But the changes in the road traffic demand on the direct and indirect influence area have not reported. In this paper, before and after survey and analysis of road traffic demand on 3 EMBLs opened in 2004 are conducted. In summary, the traffic demand of 3 EMBL road section decreased dramatically to 24.7% after the opening and then increased 1.4% after a year. The traffic demand of detour road decreased to 2.9% after the opening and then increased 0.3% after a year. Considering measurement error as ${\pm}5%$, Road traffic demands on the influence area of EMBL section are a stable state after one year. So it is presumed that the trip demand on EMBL section using vehicle does not make a detour around the influence area but divert into another transport modal.

1996년 천호대로 중앙버스전용차로가 시행된 이후 2008년 까지 8개 구간이 운영되고 있다. 그러나 중앙버스전용차로의 시행에 따른 직 간접적 영향권 내의 도로교통량 변화는 보고되지 않고 있다. 따라서 본 연구에서는 2004년 7월에 동시 개통된 3개 구간에 대한 사전 사후 도로교통량 변화를 분석하였다. 분석결과, 중앙버스전용차로 구간의 교통량은 중앙버스전용차로 개통 후(2004년 11월) 24.7%로 급격히 감소한 후, 개통 후 1년(2005년 11월) 1.4%로 안정화 된 것으로 분석되었다. 인접 우회도로 교통량은 개통 후(2004년 11월) 2.9% 감소한 후, 개통 후 1년(2005년 11월) 0.3%로 미비하게 증가하였다. 측정오차(${\pm}5%$)를 고려하면 중앙버스전용차로 교통수요는 안정화 단계에 들어섰으며, 자동차 수요가 인접지역으로 우회하기 보다는 타 수단으로 전환된 것으로 판단된다.

Keywords