This paper describes one of the ways how to decide the initial control parameters after the analog type control system is changed to digital control system. If the old control parameters were already known, the initial control parameters for initial operation could be decided easily. But sometimes, it is very difficult for the control system developer to decide initial parameters before plant machine starts up. In that case, if there is a big difference between initial parameters and optimal parameters, the whole plant itself can be in very dangerous conditions. Here is a very simple experimental method which can be very easy but useful to engineers.

이 논문은 국내 원자력 발전소에서 급수펌프 구동용 소형 터빈의 아날로그 제어시스템을 디지털 방식으로 교체한 후 발전소를 기동하기 전에 최초 제어 파라미터를 설정하는 방법에 대하여 기술하고 있다. 기존 제어시스템의 제어상수가 알려져 있는 경우에는 초기 제어상수를 쉽게 결정할 수 있으나 보통은 아날로그 시스템의 제어상수를 파악할 수 없는 경우가 많으며 이 때 초기 제어상수와 최적 제어상수는 크게 차이가 날 수도 있다. 이런 경우에는 발전소 자체의 기동이 위험한 경우도 발생할 수 있다. 매우 간단한 실험이지만 제어기술자가 플랜트를 기동하기 위해서 매우 유용한 방법과 실제로 이를 적용한 사례에 대하여 기술한다.

Keywords

References

  1. 송성일, 정창기, 김종안, 최인규, 우주희, "원전 FWPT 제어시스템 개발" 최종보고서, 전력연구원
  2. Woodward Governor Company, "Installation and OperationManual, MicroNet Digital Control", pp.65-117, 2000
  3. 최인규, 정창기, 김종안, 우주희 "제어시스템 교체시 초기 제어상수 결정 기법에 관한 연구", 제어자동화시스템 심포지엄 논문지, pp.654-656, 2007
  4. 최인규, 김종안 "원전 급수펌프구동용 터빈제어시스템개발", 대한전기학회 하계학술대회 논문집, pp.1885-1886,2006
  5. "보일러터빈 제어", 한국발전교육원, 2004
  6. 안병주 "원자력발전소 주급수펌프터빈 디지털 제어시스템 성능시험" 충남대학교 석사학위논문, 2005
  7. 박선원, 양대륙, 이관순, 이지태 "공정동특성 및 제어"희중당, 1989