Study on Energy Independence Plan for Sewage Treatment Plant

하수처리시설의 에너지 자립화 방안 연구

  • Kim, Young-Jun (Department of Mechanical Engineering, Graduate School of Kyung Hee University) ;
  • Lee, Jong-Yeon (Environmental Management Corporation) ;
  • Kang, Yong-Tae (School of Mechanical Engineering, College of Engineering, Kyung Hee University)
  • 김영준 (경희대학교 대학원 기계공학과) ;
  • 이종연 (환경관리공단) ;
  • 강용태 (경희대학교 공과대학 기계공학과)
  • Published : 2010.01.10

Abstract

The objectives of this study are to analyze the energy independence plan and to propose a suitable sewage treatment plant in Korea. The total amount of electricity consumption for public sewage treatment plant was estimated as 1,812 GWh in 2007. It was estimated that total 16 sewage treatment plants with renewable energy systems produced electricity of 15 GWh per year, which could replace 0.8% of total electricity used for sewage treatment. It was found that domestic sewage treatment plants with power generation plants by digestion gas were installed in 7 places and produced electricity of 13 GWh per year. It was also found that the power generation plants by digestion gas were the most cost-effective for sewage treatment plant out of the renewable energy systems based on the benefit-cost analysis.

Keywords

References

  1. Ministry of Environment, 2008, Feasibility study on energy independence plan for public sewage treatment plants against climate change.
  2. Jung, Y. K., 2007, Sludge into biosolids processing,diposal and utilization, Donghwa.
  3. Bae, J. K., 2008, Technology of biomass and biogasification, A-Jin.
  4. Ko, K. N. and Heo, J. C., 2008, Wind power engineering, Munundang.
  5. Park, W. S. and Lee, C. H., 2001, Capacity computation and application techniques of small hydro power, Proceedings of the Korean Solar Energy Society, pp. 134-139.
  6. Lee, S. H., 2008, Photovoltaic power generation system, Kidari.
  7. Japan Sewage Works Association, 2007, Sewage works statistics.
  8. Korea Development Institute, 2004, Research on the general guidelines for preliminary feasibility study, 4th ed., pp. 44-54.