Abstract

In 2011, the overall construction markets in KOREA are highly depressed due to decreases in orders of domestic construction markets in both private and public field. Also, we are losing competitive advantages over Chinese and Indian companies owing to the market shares on plant construction projects excessively. It is recognizable, under the circumstances that we are in interior position on high value technique to other advanced countries, that the orders of mega building and plant construction projects tend to be placed through the" Pre-construction Service", the importance of which has been emphasized domestically and internationally in recent time. However, current domestic construction companies show scarcity in understanding the general idea of the Pre-construction Service and fail in building proper structure of it. It is obvious that they cannot have any competent strategy to deal with Pre-construction Service. The Purpose of this paper is to analyze the core competence throughout preconstruction phase and, and make up for the weakness in the current pre-construction service process.

2011년을 기준으로 국내 건설시장은 민간 부문과 공공부문의 발주 감소로 전반적인 건설 경기 침체가 되고 있는 실정이며 해외 건설의 경우는 플랜트에 편중된 시장 점유로 인해 전체 건설업에 대해서는 중국 및 인도 등에 경쟁력을 잃어가고 있다. 또한 선진국에 비해 고부가가치 기술경쟁력이 열위에 있는 상황에서 국내 건설사들의 경쟁력 강화에 대한 연구들이 이루어지고 있는데, 최근 국내 외에서 Pre-construction Service(이하 Pre-con Service)의 중요성이 부각되어 대형 건축 및 플랜트 프로젝트 발주 시 이를 통한 발주가 늘어나는 추세이다. 그러나 국내 건설사들의 Pre-con 업무에 대한 일반적인 이해부족과 업무 체계 정립이 미흡하여 Pre-con Service에 대한 대응 전략은 부족한 상황이다. 이에 본 연구에서는 국내 건설사의 해외 건설 시장 진출을 위한 Pre-con Service의 핵심 업무를 규명하고 그 중요도와 현 역량 수준을 비교 분석하여 이에 따른 역량 향상의 방향을 제시하고자 한다.

Keywords

References

  1. 김명수(2009)," 두바이 사태 이후 해외건설시장 전망 및 다각화 방향", 건설 경제, 2009년 겨울호 통권 61권
  2. 김성일(2009)," 고부가가치형 해외건설 전략과 과제", 국토정책 Brief 제 231호
  3. 김예상(2001)," 건설사업관리 적용 건설사업에서의 성공요인 분석에 관한 연구",대한건축학회 논문집 계획계 17권 12호
  4. 김예상, 김한수 외(2001), 건설사업관리 적용 건설사업 에서의 성공요인 분석에 관한 연구, 대한건축학회 논문집 구조계 17 권 12호 pp.207-215
  5. 박장섭(2003)," 종합건설회사내Pre-construction 단계에서의 업무흐름 개선에 관한 연구", 한국건설관리학회 학술발표대회 논문집 제 4회, pp.481-484
  6. 박종혁(2007)," AIA 및 CMAA의 CM 분석을 통한 국내 CM 적용 시안", 한국건축시공학회지 7권 4호, pp.83-91 https://doi.org/10.5345/JKIC.2007.7.4.083
  7. 유승규(2009)," 국내 대형건설회사의 책임형 건설사업관리 역량 분석", 한국건설관리학회 논문집 10권 5호
  8. 이재은(2001), "해외 코스트매니지먼트 전문회사의 주요업무에 관한 연구", 대한건축학회 춘계학술발표대회 논문집 구조계 21권 1호
  9. 탁현우(2010)," 해외 플랜트 프로젝트의 시공 이전 단계 표준 업무 프로세스 구축", 대한설비공학회 하계학술발표대회 2010-06 pp.806-811
  10. 국토해양부 건설사업관리 업무지침(2009),제2009-825호
  11. Donald S. Barrie, Boyd C. Paulson, (2000). Professional Construction Management 3rd ed. McGrawHill, pp.15-21.
  12. Texas Department of Transportation(2007), "Construction Contract Administration Manual Section 3: Pre-Construction Conference",Texas Department of Transportation

Cited by

  1. Influence of Overseas Construction Business on Construction Companies' Financial Stability vol.14, pp.1, 2013, https://doi.org/10.6106/KJCEM.2013.14.1.043
  2. A Study on the Investigation into Obstacles in Overseas CM Projects vol.14, pp.5, 2013, https://doi.org/10.6106/KJCEM.2013.14.5.113
  3. A Study on Competency Evaluation and Improvement Plan of Electrical Construction Management Using Importance-Performance Analysis vol.15, pp.3, 2014, https://doi.org/10.6106/KJCEM.2014.15.3.103
  4. The Development of a Standardized Work Process for Planning of Plant Project - Focus on Excavating and Investing Participation Plan - vol.17, pp.4, 2016, https://doi.org/10.6106/KJCEM.2016.17.4.003
  5. Marketing Strategy and Influential Factors based on the Attributes of Unit Modular System vol.15, pp.1, 2014, https://doi.org/10.6106/KJCEM.2014.15.1.078
  6. Assessment of FEED Structure and Functions for Project Management of Thermal Power Plant Construction vol.16, pp.5, 2015, https://doi.org/10.6106/KJCEM.2015.16.5.065
  7. Impact Analysis of Economic Fluctuation of Saudi Arabia on Korean Overseas Construction Business vol.17, pp.2, 2016, https://doi.org/10.6106/KJCEM.2016.17.2.039
  8. An Analysis of Concentrate Competency in Bidding Process for Overseas Project of Domestic Construction Companies vol.15, pp.3, 2014, https://doi.org/10.6106/KJCEM.2014.15.3.023
  9. Evaluation of CM Capability based on Business Functions for International Plant Construction vol.15, pp.6, 2014, https://doi.org/10.6106/KJCEM.2014.15.6.003
  10. An Analysis of Competency at Each Phase of PMC for Overseas Architecture Project Using the IPA vol.16, pp.3, 2015, https://doi.org/10.6106/KJCEM.2015.16.3.059
  11. Growth Model for Korean CM Firms based on 2012 Statistics vol.15, pp.6, 2014, https://doi.org/10.6106/KJCEM.2014.15.6.092
  12. Web-based Collaboration Systems for Structural Design: A Review vol.5, pp.4, 2015, https://doi.org/10.13161/kibim.2015.5.4.037