DOI QR코드

DOI QR Code

A Study on Siting Criteria for GBAS Ground System

GBAS 지상시스템 설치후보지 선정 기준에 관한 연구

  • 정명숙 (한국항공우주연구원 차세대항행팀) ;
  • 고유리 (한국항공우주연구원 차세대항행팀) ;
  • 최철희 (한국항공우주연구원 차세대항행팀) ;
  • 고완진 (한국항공우주연구원 차세대항행팀) ;
  • 배중원 (한국항공우주연구원 차세대항행팀) ;
  • 전향식 (한국항공우주연구원 차세대항행팀) ;
  • 김동민 (한국항공우주연구원 차세대항행팀)
  • Received : 2012.08.13
  • Accepted : 2012.09.12
  • Published : 2012.09.30

Abstract

Since the site chosen for GBAS ground system will have a direct effect on the performance of the GBAS, the GBAS ground system siting is mightily important in the GBAS installation process. Therefore, in this paper, the major equipment of the GBAS ground system is introduced and a formal process is described for the identification and evaluation of candidate GBAS sites. Also, this paper described detail siting requirements for the GBAS ground system such as reference receiver, VDB antenna and shelter respectively.

Keywords

Acknowledgement

Grant : 위성항법지역보강시스템 운용기술 개발

Supported by : 국토해양부

References

  1. 전향식, 김동민, 염찬홍, "GBAS 인증체계기술 개발을 위한 환경구축 연구", 한국항공우주학회 추계학술발표회 논문집(II), 2010, pp. 1554-1557.
  2. Honeywell, "GBAS Siting Plan", Version C, 2009
  3. 정명숙, 최철희, 고완진, 고유리, 배중원, 전향식, 김동민, "김포공항의 GPS 위성신호 수신환경 분석", 한국항공우주학회 춘계학술대회, 2012
  4. RTCA Inc., "Minimum Aviation System Performance Standards for Local Area Augmentation System(LAAS)", Washington, D.C, RTCA/DO-245A, 2004
  5. C. Shively, "Safety Concepts for Mitigation of Ionospheric Anomaly. Errors in GBAS", Proceedings of ION NTM 2008, San Diego, CA, January 28-30, 2008
  6. Honeywell, "Work Instruction PortaSAT Setup and Configuration", Version 1.0, 2011
  7. Garrett McKelvey, Pat Shannon, and Brian Koosmann, "Houston Intercontinental Airport(IAH) - Site Assessment Report", Honeywell, 2011
  8. EUROCONTROL, "PEGASUS: Technical Notes on CMC", PEG-TN-CMC, 2008
  9. Timothy A. Murphy, William M. Harris, Scott L. Pelton and Ngoc H. Bui, "Volume III - Multipath Flight Test Program & Results", D6-83447-3, 2005
  10. John Warburton, "LAAS Test Prototype Data Collection and Processing", 7th International GBAS Working Group, 2007
  11. John Warburton, "Technical Activities GBAS Integrity/HMI Update", 7th International GBAS Working Group, 2007

Cited by

  1. GBAS Cat-I 지상시스템 시범공항 구축을 위한 설치후보지 검토 vol.20, pp.4, 2012, https://doi.org/10.12985/ksaa.2012.20.4.021