An Improvement Plan in Applying Performance Bond for the Direct Construction Control Project

직할시공사업의 계약이행보증방식 적용 개선방안

  • 송상훈 (한국토지주택공사 토지주택연구원) ;
  • 방종대 (한국토지주택공사 토지주택연구원) ;
  • 손정락 (한국토지주택공사 토지주택연구원) ;
  • 류옥현 (한국토지주택공사) ;
  • 박동균 (한국토지주택공사) ;
  • 김기현 (한국토지주택공사 토지주택연구원)
  • Received : 2012.08.02
  • Published : 2012.10.25

Abstract

Direct construction control method is based on, literally, the direct contract between owner and specialty contractors without involvement of a general contractor. The owner conducts the role of a general contactor as well as owner's original responsibility while construction works being executed by specialty contractors. Owing to higher risks brought by this unusual delivery system, performance bond is regarded more important in this method. However, the legislation and practice for performance bond in Korea do not reflect the characteristics of construction projects and direct construction control method properly. Therefore, this paper aimed to figure out the problems and improve the current status in issuing bond and processing guaranteed obligation. The operation systems concerning performance bond in advanced countries and the actual cases in direct construction control method were reviewed, and the improvement plan was established based on implications from them.

Keywords

Acknowledgement

Supported by : 한국토지주택공사(LH)

References

  1. 김예상, "건설제도 및 계약", 보문당, 2008
  2. 박동규, 김성일, "건설보증시장의 구조혁신과 제도선진화", 한국건설관리학회지, 10권 2호, 한국건설관리학회, 2009
  3. 빈재익, "공사이행보증제도 개선방안 검토", 건설경제, 통권40권, 국토연구원, 2004
  4. 이상훈, "미국공공사업의 건설보증제도의 운영 현황과 실태", 한국건설관리학회지, 10권 1호, 한국건설관리학회, 2009
  5. 이은형, 홍성호, "전문건설업체 경영성과 분석 -외부회계감사 대상기업을 중심으로-", 대한건설정책연구원, 2008
  6. 조달청 해외조달정보센터 해외조달정보 조사자료실, "캐나다 및 미국의 계약이행보증금의 보증수수료율 현황", 조달청
  7. 현병철, "건설공사도급계약당사자 보호제도", 법학논총, 제25집 제1호, 한양대학교 법학연구소, 2001
  8. Konchar, M. and Sanvido, V., Comparison of U.S. Project Delivery Systems, Journal of Construction Engineering and Management, American Society of Civil Engineers, 124(6), 1998