DOI QR코드

DOI QR Code

Assessment of Flood Impact on Downstream of Reservoir Group at Hwangryong River Watershed

황룡강 유역 저수지군 하류하천 영향평가

  • 황순호 (서울대학교 농업생명과학대학 생태조경.지역시스템공학부) ;
  • 강문성 (서울대학교 농업생명과학대학 조경.지역시스템공학부, 농업생명과학연구원) ;
  • 김지혜 (서울대학교 농업생명과학대학 생태조경.지역시스템공학부) ;
  • 송정헌 (서울대학교 농업생명과학대학 생태조경.지역시스템공학부) ;
  • 전상민 (서울대학교 농업생명과학대학 생태조경.지역시스템공학부) ;
  • 이상현 (서울대학교 농업생명과학대학 생태조경.지역시스템공학부) ;
  • 최진용 (서울대학교 농업생명과학대학 조경.지역시스템공학부, 농업생명과학연구원)
  • Received : 2012.04.30
  • Accepted : 2012.05.15
  • Published : 2012.05.31

Abstract

Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.

Keywords

References

  1. Cho, Y. J., 2009. The four major restoration project master plan, pp. 144-162. Ministry of Land, Transport and Maritime Affairs (in Korean).
  2. Ministry for Food, Agriculture, Forestry and Fisheries (MFAFF), 2005. Emergency action plan (Yeongsan_river) (in Korean).
  3. Han, K. Y., K. H. Choi, W. kim, and D. H. Kim, 2005. Flood routing analysis considering the effects of dams in Han river. Journal of Korea Water Resources Association 38(9): 747-760 (in Korean). https://doi.org/10.3741/JKWRA.2005.38.9.747
  4. Kang, M. G., X. Cai, and D. K. Koh, 2009. Real-time forecasting of flood discharges upstream and downstream of a multipurpose dam using Grey models. Journal of Korea Water Resources Association 42(1): 61-73 (in Korean). https://doi.org/10.3741/JKWRA.2009.42.1.61
  5. Koo, J. H., 2001. A gis based integrated system for highway drainage design. Master degree. Dissertation, Seoul, Korea: Seoul National University (in Korean).
  6. Korea Rural Community Corporation (KRC), 2010. Annual statistics report of agricultural infrastructure project (in Korean).
  7. Korea Rural Community Corporation (KRC), 2012. http://www.ekr.or.kr.
  8. Lee, J. W., H. S. Kim, and H. S. Woo, 1993. An analysis of the effect of damming on flow duration characteristics of five major rivers in Korea. Journal of Korean Society of Civil Engineers 18(3): 79-91 (in Korean).
  9. Noh, J. K., 2010. Affecting water supply capacity followed by allocating flood control volume in heightening reservoir. Journal of Korean National Committee on Irrigation and Drainage 17(2): 57-70 (in Korean).
  10. Rhee, K. H., B. S. Moon, G. J. Nam, and J. H. Jeong, 2002. Optimization of reservoir operation of flood period using HEC-5 model. Korean Society of Civil Engineers Symposium, KSCE pp. 1501-1504 (in Korean).
  11. Sung, C. H., 2004. A comparative study of unit hydrograph models using HEC-HMS at a small watershed. Master degree. Dissertation, Seoul, Korea: Seoul National University (in Korean).
  12. U.S. Army Corps of Engineers (USACE), 1998. HEC-5, Simulation of flood control and conservation systems user's manual version 8.0.
  13. U.S. Army Corps of Engineers (USACE), 2010. Hydrologic modeling system HEC-HMS user's manual version 3.5.
  14. Yoon, Y. N., C. S. Yoo, J. H. Ahn, I. T. Yang, and D. K. Koh, 1998. An analysis on the variation of long-term runoff characteristics of basin before and after dam construction: I. Estimation of NWS-PC model parameters using GIS. Journal of Korean Society of Civil Engineers 18(II-5): 449-459 (in Korean).
  15. Yoon, Y. N., C. S. Yoo, J. H. Ahn, I. T. Yang, and D. K. Koh, 1998. An analysis on the variation of long-term runoff characteristics of basin before and after dam construction: II. An analysis on the variation of long-term runoff characteristics of basin using model parameters estimation. Journal of Korean Society of Civil Engineers 18(II-5): 461-468 (in Korean).

Cited by

  1. Effects of Agricultural Reservoir Rehabilitation on their Flood Control Capacities vol.55, pp.6, 2013, https://doi.org/10.5389/KSAE.2013.55.6.057