DOI QR코드

DOI QR Code

A Study on the Process Design of Advanced Planning & Scheduling for Transformer Operation Improvement

변합기 공정 개선을 위한 APS(Advanced Planning & Scheduling) 프로세스 설계에 관한 연구

  • Hwang, Duk-Hyuong (Thunder Cooperation) ;
  • Nam, Seung-Don (Department of Tool and Mould Design, Yuhan College) ;
  • Cho, Young-Wook (Department of Technology and Systems Management, Induk Institute of Technology) ;
  • Oh, Sun-Il (Department of Industrial & Management Engineering, Myongji University) ;
  • La, Seoung-Hun (Department of Industrial & Systems Engineering, Myongji College) ;
  • Kang, Kyong-Sik (Department of Industrial & Management Engineering, Myongji University)
  • 황덕형 ((주)썬더) ;
  • 남승돈 (유한대학교 금형설계과) ;
  • 조용욱 (인덕대학 테크노경영과) ;
  • 오선일 (명지대학교 산업경영공학과) ;
  • 나승훈 (명지전문대학 산업시스템경영과) ;
  • 강경식 (명지대학교 산업경영공학과)
  • Received : 2012.04.20
  • Accepted : 2012.06.11
  • Published : 2012.06.30

Abstract

As enterprises, based on the forecast of the customer's demand and collaboration with the suppliers, establish the integrated system directing supply, production, and distribution for the increase of productivity, Thus, this study intends to find the most urgent and critical factors for the improvement of the information system by externalizing factors affecting the operation of information system, suggest the process to improve the relevant functions of information system, and design the process. As a result of the analysis of the previous studies on the improvement of the information system, many studies were conducted on the improvement of ERP and SCM, yet there was no study conducted targeting about APS (Advanced Planning & Scheduling). Thus, this study chose APS as the subject for the design of the process for the improvement for the information system.

Keywords

References

  1. 김동진(2003), "APS(Advanced Planning & Scheduling) 를 활용한 생산물류정보시스템 구축에 관한 연구" 대한안전경영과학회 추계학술대회논문집, pp93-96
  2. 박경종, 오형술, 이충수(2002), "전자산업의 생산 계획 및 스케줄링을 위한 Factory Planner적용", 한국경영과학회 춘계학술대회논문집, pp8-15
  3. 오형술, 박경종, 이충수 (2002), "Supply Chain 상에서 공장내의 생산 계획 및 스케줄링을 위한 Factory Planner 적용", 산업경영시스템학회지 제25 권 제4호 pp8-15
  4. 하정훈, 이영관, 옥창수(2011), "계층적분석기법을 이용한 APS 개선방안 도출" 대한산업경영시스템학회지, Vol.34 No.3, pp.123-133
  5. Kejia Chen, Ping Ji and Qing Wang(2011), "A case study for advanced planning and scheduling", Journal of systems Science and Systems Engineering Vol. 20, No 4, pp460-474 https://doi.org/10.1007/s11518-011-5180-z
  6. Kishore, C.V.(2001), "Criticlal Success Factors for Implementation of Enterprise Resource Planning System", Thailand :AIT.
  7. Marien, Edward, J.(2000,March/April). "The Four Supply Chain Enablers", Supply Chain Management Review, p60-p68.
  8. Mitsuo Gen, Wen Qiang Zhang, Lin Lin(2009), "Survey of Evolutionary Algorithms in Advanced Planning and Scheduling", Journal of Korean Institute of Industrial Engineers, Vol. 35, No. 1, pp15-35
  9. Rhonda, R,L., Karen, S. and R.,J.V.,(2000.7), "Self-Assessment : A Foundation for supply chain Success", Supply Chain Management Review, pp81-87.
  10. Saaty Thomas L.(1994), "Highlight and Critical Points in the Theory and Application of the Analytic Hierarchy process, Eur. J. Operational Research (74)3, pp426-447
  11. T. L. Saaty (1980), The Analytic Hierarchy Process, Mcgraw-Hill
  12. 조용욱 외(1999), 로봇선택을 위한 의사결정 모델 개발, 대한안전경영과학회지