References
- Kim, C. H., and Hong, Y.,"An Optimal Production Cycle and Inspection Schedules in A Deteriorating Machine", Journal of the Korean Institute of Industrial Engineers, 23(2), pp.2 61-273, 1997.
- Kim, C. H.,"An EMQ Model with Rework", Journal of the Korean Institute of Industrial Engineers, 31(2), pp. 173-179, 2005.
- Giri, B. C., Yun, W. Y., and Dohi, T.,"Optimal design of unreliable production inventory systems with variable production rate", European Journal of Operational Research, 162(2), pp. 372-386, 2005. https://doi.org/10.1016/j.ejor.2003.10.015
- Groenevelt, H., Pintelon, L., and Seidmann, A., "Production Lot Sizing with Machine Breakdowns", Management Science, 38(1), pp. 104-123, 1992a. https://doi.org/10.1287/mnsc.38.1.104
- Groenevelt, H., Pintelon, L., and Seidmann, A.,"Production Batching with Machine Breakdowns and Safety Stocks", Operations Research, 40(5), pp. 959-971, 1992b. https://doi.org/10.1287/opre.40.5.959
- Jamal, A. M. M., Sarker, B. R., and Mondal, S.,"Optimal Manufacturing Batch Size with Rework Process at a Single-Stage Production System", Computers & Industrial Engineering, 47(1), pp.77-89, 2004. https://doi.org/10.1016/j.cie.2004.03.001
- Kim, C. H., and Hong, Y.,"An Extended EMQ Model for A Failure Prone Machine with General Lifetime Distribution", International Journal of Production Economics, 49, pp. 215-223, 1997. https://doi.org/10.1016/S0925-5273(97)00013-3
- Kim, C. H., and Hong, Y.,"An Optimal Production Run Length in Deteriorating Production Processes", International Journal of Production Economics, 58, pp. 183-189, 1999. https://doi.org/10.1016/S0925-5273(98)00119-4
- Lawless, J. F., Statistical Models and Methods for Lifetime Data, John Wiley & Sons, 1982.
- Lee, H. L., and Rosenblatt, M. J.,"Simultaneous Determination of Production Cycle and Inspection Schedules In a Production System", Management Science, 33(9), pp. 1125-1136, 1987. https://doi.org/10.1287/mnsc.33.9.1125
- Liou, M. J., Tseng, S. T., and Lin, T. M.,"The Effects of Inspection Errors to the Imperfect EMQ Model", IIE Transactions, 26(2), pp. 42-51, 1994. https://doi.org/10.1080/07408179408966595
- Porteus, E. L.,"Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction", Operations Research, 34(1), pp. 137-144, 1986. https://doi.org/10.1287/opre.34.1.137
- Rahim, M. A. M.,"Joint Determination of Production Quantity, Inspection Schedule, and Control Chart Design", IIE Transactions, 26(6), pp. 2-11, 1994.
- Rosenblatt, M. J., and Lee, H. L.,"Economic Production Cycles with Imperfect Production Processes", IIE Transactions, 18(1), pp. 48-55, 1986. https://doi.org/10.1080/07408178608975329
- Ross, S. M., Stochastic Processes, John Wiley, New York. 1983.
- Salameh, M. K., and Jaber, M. Y.,"Economic Production Quantity Model for Items with Imperfect Quality", International Journal of Production Economics, 64, pp. 59-64, 2000. https://doi.org/10.1016/S0925-5273(99)00044-4
- Zhang, X., and Gerchak, Y.,"Joint Lot Sizing and Inspection Policy in an EOQ Model with Random Yield", IIE Transactions, 22(2), pp. 41-47, 1990. https://doi.org/10.1080/07408179008964156