Analysis of Maintenance costs through the Maintenance Cycle and Maintenance Cost Ratio for Educational Building

교육시설물의 보수주기.보수비용 비율 도출을 통한 유지보수비용 분석

  • Published : 2013.09.01

Abstract

The purpose of this study is to analyze maintenance costs for educational facilities of BTL Projects. For this, it was formed that work classification system considering the incidence of maintenance through interviews and a questionnaire survey with experts. And prevention/average/substantial maintenance cycle and maintenance costs ratio were analyzed for maintenance costs analysis according to work classification, the initial costs of the 5 educational facility examples of BTL Projects was investigated. The results of the prevention/average/substantial maintenance costs analysis on the basis of maintenance cycle / maintenance costs ratio and the initial cost of the 5 examples are as follows. prevention maintenance costs is about 5,136,028 thousand won, average is about 4,095,324 thousand won, substantial is about 3,504,732 thousand won, Therefore, this analysis results of prevention/average/substantial maintenance cycle / maintenance costs ratio and maintenance cost are helpful and can be utilzed in the early stages of business of domestic educational facilities construction projects for estimating maintenance costs in the future and planning of maintenance cost management.

Keywords

References

  1. 김영구, 초중등 교육시설의 유지관리비 분석, 인천광역시 북구교육청, 2009
  2. 김청융(2008). "교육시설 BTL 사업에서 LCC 분석의 문제점 도출 및 해결방안", 한국건설관리학회 논문집, 제9권 제4호
  3. 이미혜(2009). "교육시설 유지관리 수선 기준 설정에 관한 연구", 대한건축학회 논문집, 제25권 제9호
  4. 하헌석, BTL학교 건축물의 장기수선비용 분석을 통한 장기수선충당금 산정에 관한 연구, 중앙대학교 석사학위 논문, 2007
  5. 법인세법 시행규칙(2011). "건축물 등의 기준내용연수 및 내용연수 범위표", 제15조 제3항