A Study on Periodic Review Inventory System under Stochastic Budget Constraint

확률적 예산 제약을 고려한 주기적 재고관리 정책에 대한 연구

  • Lee, Chang-Yong (Dept. of Industrial and Systems Engineering, Kongju National University) ;
  • Lee, Dongju (Dept. of Industrial and Systems Engineering, Kongju National University)
  • 이창용 (공주대학교 산업시스템공학과) ;
  • 이동주 (공주대학교 산업시스템공학과)
  • Received : 2014.02.28
  • Accepted : 2014.03.14
  • Published : 2014.03.31

Abstract

We develop an optimization algorithm for a periodic review inventory system under a stochastic budget constraint. While most conventional studies on the periodic review inventory system consider a simple budget limit in terms of the inventory investment being less than a fixed budget, this study adopts more realistic assumption in that purchasing costs are paid at the time an order is arrived. Therefore, probability is employed to express the budget constraint. That is, the probability of total inventory investment to be less than budget must be greater than a certain value assuming that purchasing costs are paid at the time an order is arrived. We express the budget constraint in terms of the Lagrange multiplier and suggest a numerical method to obtain optional values of the cycle time and the safety factor to the system. We also perform the sensitivity analysis in order to investigate the dependence of important quantities on the budget constraint. We find that, as the amount of budget increases, the cycle time and the average inventory level increase, whereas the Lagrange multiplier decreases. In addition, as budget increases, the safety factor increases and reaches to a certain level. In particular, we derive the condition for the maximum safety factor.

Keywords

References

  1. Chao, X. and Zipkin, P.H., Optimal Policy for a Periodic- Review Inventory System Under a Supply Capacity Contract. Operations Research, 2008, Vol. 56, No. 1, p 59-68. https://doi.org/10.1287/opre.1070.0478
  2. Lee, D.J. and Lee, C.-Y., A Study on Inventory Control Policy for Semi-Finished Product and Optional Components. Soc. of Kor. Ind. and Sys. Eng, 2013, Vol. 36, No. 4, p 31-37. https://doi.org/10.11627/jkise.2013.36.4.31
  3. Eynan, A. and Kropp, D.H., Periodic review and joint replenishment in stochastic demand environments. IIE Transactions, 1998, Vol. 30, p 1025-1033.
  4. Eynan, A. and Kropp, D.H., Effective and simple EOQlike solutions for stochastic demand periodic review systems, European J. of Oper. Res, 2007, Vol. 180, p 1135-1143. https://doi.org/10.1016/j.ejor.2006.05.015
  5. Federgruen, A. and Zipkin, P., An inventory model with limited production capacity and uncertain demands I. The average-cost criterion, Math. Oper. Res, 1986, Vol. 11, No. 2, p 193-207. https://doi.org/10.1287/moor.11.2.193
  6. Federgruen, A. and Zipkin, P. An inventory model with limited production capacity and uncertain demands II. The discounted-cost criterion, Math. Oper. Res. 1986, Vol. 11, No. 2, p 208-215.
  7. Ghalebsaz-Jeddi, B., Shultes, B.C., and Haji, R., A multi-product continuous review inventory system with stochastic demand, backorders, and a budget constraint. Euro J of Oper Res, 2004, Vol. 158, p 456-469. https://doi.org/10.1016/S0377-2217(03)00363-1
  8. Hausman, W.H., Lee, H.L., and Zhang, A.X., Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies. European J. of Oper. Res, 1998, Vol. 109, p 646-659. https://doi.org/10.1016/S0377-2217(97)00152-5
  9. Kiesmüller, G.P., A multi-item periodic replenishment policy with full truckloads. Int. J. Production Economics, 2009, Vol. 118, p 275-281. https://doi.org/10.1016/j.ijpe.2008.08.024
  10. Roundy, R. and Muckstadt, J.A., Heuristic computation of periodic-review base stock inventory policies, Management Sci, 2000, Vol. 46, No. 1, p 104-109. https://doi.org/10.1287/mnsc.46.1.104.15129
  11. Schrijver, S.K., Aghezzaf, E.H., and Vanmaele, H., Aggregate constrained inventory system with independent multi-product demand : Control practices and theoretical limitations. Int. J. Production Economics, 2013, Vol. 143, p 416-423. https://doi.org/10.1016/j.ijpe.2011.08.019
  12. Wang, T.Y. and Hu, J.M., An inventory control system for products with optional components under service level and budget constraints. Euro J of Oper Res, 2008, Vol. 189, p 41-58. https://doi.org/10.1016/j.ejor.2007.05.025
  13. Wang, T.Y. and Hu, J.M., Heuristic method on solving an inventory model for products with optional components under stochastic payment and budget constraints. Exp sys with App, 2010, Vol. 37, p 2588-2598. https://doi.org/10.1016/j.eswa.2009.08.017

Cited by

  1. 군 정비창 자재소요계획 vol.37, pp.4, 2014, https://doi.org/10.11627/jkise.2014.37.4.24