DOI QR코드

DOI QR Code

The Application and Verification of the 2MVA Battery Energy Storage System(BESS) with Wind-turbine in Micro-grid of Gapado, Jeju

가파도 마이크로그리드에서의 풍력발전 연계를 위한 2MVA급 배터리 에너지 저장시스템(BESS) 적용 및 실증

  • Received : 2014.02.04
  • Accepted : 2014.03.31
  • Published : 2014.08.20

Abstract

This paper shows the test result of 2MVA BESS(Battery Energy Storage System) with wind-turbine in micro-grid of the Gapado. To implement of micro-grid with BESS, characteristics of generator and customer load in grid are considered. Also, to operate of 2-parallel PCU(Power Conversion Unit) in BESS, the droop control is adopted with operating mode of grid independent. Performances of BESS with wind-turbine were verified by analysis of power quality such as voltage harmonics, ratio of voltage and frequency regulation, and by measurement of waveform such as output voltage and current.

Keywords

References

  1. Sergio Vazquez, Srdjan M. Lukic, Eduardo Galvan, Leopoldo G. Franquelo, Juan M. Carrasco, "energy storage systems for transport and grid applications," IEEE Trans. Industrial Electronics, Vol. 57, No. 12, pp. 3881-3895, 2010. https://doi.org/10.1109/TIE.2010.2076414
  2. K.C.Divya, Jacob Ostergaard, "Battery energy storage technology for power system - An overview," Electric Power Systems Research, pp. 511-520, 2009.
  3. Young-hun Jung,, "Korea's Smart Grid policy and deployment," Ministry of Knowledge Economy(MKE) Counselor to the Minister, pp. 15-17, Nov. 2013.
  4. Anca D. Hansen, Florin lov, Frede Blaabjerg and Lars H. Hansen, "Review of Comtemporary Wind Turbine Concepts and their Market Penetration," Wind Engineering Vol 28, No. 3, pp. 247-263, 2004. https://doi.org/10.1260/0309524041590099
  5. Smart Renewable Project Business Plan(POSCO ICT), 2009.
  6. Soo-Hong Kim, Tae-Hyeong Kim, Yun-Hyun Kim, Dong-Seok In, Byung-Ki Kwon, Chang-Ho Choi, "A Development of 2MVA Battery Energy Storage System," The Transactions of Korean Institute of Power Electronics, Vol. 17, No. 2, pp. 174-181, Apr. 2012. https://doi.org/10.6113/TKPE.2012.17.2.174
  7. Seung-Jin Oh, Tae-Hyeong Kim, Byung-Ki Kwon, "A Parallel Control Algorithm using Droop Control for Battery Energy Storage System(BESS)," The Korean Institute of Power Electronics, pp. 131-132, Nov. 2013.
  8. Seung-Jin Oh, Tae-Hyeong Kim, Byung-Ki Kwon, "A Parallel Control Algorithm using Droop Control for Battery Energy Storage System(BESS)," The Korean Institute of Power Electronics, pp. 131-132, Nov. 2013.
  9. Seung-Jin Oh, Tae-Hyeong Kim, Byung-Ki Kwon, "A Parallel Control Algorithm using Droop Control for Battery Energy Storage System(BESS)," The Korean Institute of Power Electronics, pp. 131-132, Nov. 2013.
  10. IEEE Application Guide for IEEE Std $1547.2^{TM}$ 2008.

Cited by

  1. A Study on the Modeling and Operation Algorithm of Independent Power System for Carbon Free vol.65, pp.5, 2016, https://doi.org/10.5370/KIEE.2016.65.5.760