DOI QR코드

DOI QR Code

A component-based construction process control system for increasing modifiability

변경 용이성 증대를 위한 컴포넌트 기반의 건설공정관리시스템

  • 김의룡 (한국산업기술대학교 컴퓨터공학과) ;
  • 김신령 (동서울대학교 정보통신과) ;
  • 김영곤 (한국산업기술대학교 컴퓨터공학과)
  • Received : 2015.11.12
  • Accepted : 2015.12.11
  • Published : 2015.12.31

Abstract

The construction process and safety management are an important means of the total projects for the decision-making. As an important management tool of cost, resources and risks of the project, the analysis and evaluations are recorded as an important asset of company. Also, it has become a safety device that could reduce risk factors repeatedly by the decision-making methods for the future similar projects. Component-based software, by reusing the useful part, which was prepared without newly developing all that, by building a new software product, the long-term continuous/steady through the provision of a component-based software, by securing a sales base, it should be the development and supply a wide range of applications. In this paper, we propose the construction process control systems for increasing modifiability of process creation and modification for business efficiency in accordance with the diverse trends in the construction process as a low-cost niche through a component-based software supplier to solve these problems.

건설공정 및 안전관리는 프로젝트 전 의사결정의 중요한 수단이며, 프로젝트의 비용과 자원, 위험 등의 중요한 관리도구로 제시되기 때문에 프로젝트 결과에 대한 분석 및 평가 자료는 기업의 중요한 자산으로 기록된다. 또한 차후 유사 프로젝트에 대한 의사결정 수단으로 위험요인을 반복적으로 줄이는 안전장치가 되고 있다. 컴포넌트 기반 소프트웨어는 모든 것을 새로 개발하지 않고 준비된 유용한 부분들을 재사용함으로써 새로운 소프트웨어 프로덕트를 구축하여 컴포넌트기반의 소프트웨어 제공을 통한 장기간 지속적/안정적 매출기반을 확보하고 다양한 애플리케이션을 개발 공급하여야 할 것이다. 따라서 본 논문에서는 이러한 문제점을 해결하기 위해서 마인드맵을 이용한 컴포넌트기반 소프트웨어 공급을 통하여 저비용 틈새시장 공략으로 건설공정의 다양성 추세에 따른 비즈니스 효율성을 위한 공정생성 및 변경의 용이성의 증대를 위한 건설공정관리 시스템을 제안한다.

Keywords

References

  1. Seoung-Bin Ye, Su-Yeoung Yang, Hee-taek Ceon, "The Development on Component-based Environment Information Monitoring System", The Korea Institute of Electronic Communication Sciences 7(1), pp.195-201, 2012.2.
  2. Jun Young-Woong, Lee Myoung-Sik, "A Study on the Development of a Construction Field Management Model based on BIM", The Journal of The Korean Institute of Building Construction 10(1), pp.127-135, 2010.2.
  3. Gwang-yeul Yun, Hae-young Yoo, "Design of Improved SOA based System for Reducing Initial Construction Costs", The Journal of KISS : Software and Applications 39(9), pp.679-687, 2012.9.
  4. Jung Woo Lee, Hyun Jung La, Soo Dong Kim, "A Service Reusability-Centric Process for Developing Software-as-a-Service", The Journal of KISS : Software and Applications, 37(7), pp.518-535, 2010.7.
  5. Tai-Suk Kim, Jong-Soo Kim, "Design and Implementation of Progress Management System Using Swing Component Based on Internet", The Journal of Korea MultimedIa Society 13(8), pp.1163-1170, 2010.8.
  6. Young-Do Joo, "Implementation of Facility Maintenance Management System Using Smart Phones", The Journal of The Institute of Internet, Broadcasting and Communication(JIIBC), VOL. 13 No. 1, pp.191-197,2013.2. https://doi.org/10.7236/JIIBC.2013.13.1.191
  7. Jongtaek Oh, "A Study on Global Positioning System of Smart Phone in indoor", The Journal of The Institute of Internet, Broadcasting and Communication(JIIBC), Vol. 15, No. 2, pp.151-156, 2015.2. https://doi.org/10.7236/JIIBC.2015.15.2.151
  8. Dong-Lim Hyun, Eun-Gil Kim, Jong-Hoon Kim, "Implementation of Android-based Mindmap Application for Shared Thinking", The Journal of Fishrifs And Marine Sciences Education 23(2), pp.234-243, 2011.6.
  9. Yoon, Cheol-Ho, "Usability Study of Different Types of Smart Phones Using KLM Model", Journal of the Korea Academia-Industrial cooperation Society(JKAIS), Vol. 14, No. 10 pp. 4700-4705, 2013. https://doi.org/10.5762/KAIS.2013.14.10.4700
  10. Cheol-Jung Yoo, Hye-Min Noh, "Test Case Generation Techniques based on Use Cases for Interoperability Test of Component-Based software", The Journal of KISS : Software and Applications 36(5), pp.361-375, 2009.5.