DOI QR코드

DOI QR Code

Sizing of Vertical Borehole Heat Exchangers using TRNOPT

TRNOPT를 이용한 수직 지중열교환기 길이 산정 방법에 관한 연구

  • Park, Seung-Hoon (Department of Architectural Engineering, Graduate school, Inha University) ;
  • Lee, Hyun-Soo (Department of Architectural Engineering, Graduate school, Inha University) ;
  • Jang, Young-Sung (GS E&C Building Science Research Team) ;
  • Kim, Eui-Jong (Department of Architectural Engineering, Inha University)
  • Received : 2016.08.01
  • Accepted : 2016.09.09
  • Published : 2016.10.10

Abstract

Ground-coupled heat pump systems have been widely used, as they are regarded as a renewable energy source and ensure a high annual efficiency. Among the system components, borehole heat exchangers (BHE) play an important role in decreasing the entering water temperature (EWT) to heat pumps in the cooling season, and consequently improve the COP. The optimal sizing of the BHEs is crucial for a successful project. Other than the existing sizing methods, a simulation-based design tool is more applicable for modern complex geothermal systems, and it may also be useful since design and engineering works operate on the same platform. A simulation-based sizing method is proposed in this study using the well-known Duct STorage (DST) model in Trnsys. TRNOPT, the Trnsys optimization tool, is used to search for an optimal value of the length of BHEs under given ground loads and ground properties. The result shows that a maximum EWT of BHEs during a design period (10 years) successfully approaches the design EWT while providing an optimal BHE length. Compared to the existing design tool, very similar lengths are calculated by both methods with a small error of 1.07%.

Keywords

References

  1. Sohn, B., 2012, Performance prediction of geothermal heat pump system by line-source and modified DST (TRNVDSTP) models, Korea Society of Geothermal Energy Engineers, Vol. 8, No. 2, pp. 61-69.
  2. Eskilson, P., 1987, Thermal analysis of heat extraction boreholes, Ph.D. Thesis, University of Lund, Sweden.
  3. Kim, E. J., 2014, Verification of the boundary conditions used for generating g-functions and developement of a TRNSYS simulation model using g-functions, Korean Journal of Air-Conditioning and Refrigeration Engineering, Vol. 26, No. 9, pp. 416-423. https://doi.org/10.6110/KJACR.2014.26.9.416
  4. Wetter, M., 2016, Generic optimization program user manual, The Regents of the University of California, Version 3.1.1.
  5. Philippe, M., Bernier, M., and Marchio, D., 2010, Vertical Geothermal Borefields, Journal of ASHRAE, July 2010, pp. 20-28.
  6. Bernier, M., Chahla, A., and Pinel, P., 2008, Long-term ground-temperature changes in geo-exchange systems, ASHRAE transactions, Vol. 114, No. 2, pp. 342-350.
  7. Hellstrom, G., Mazzarella, L., and Pahud, D., 1996, Duct ground storage model-TRNSYS version, Department of Mathematical Physics, University of Lund, Sweden.
  8. Bertagnolio, S., Bernier, M., and Kummert, M., 2011, Comparing vertical ground heat exchanger models, Journal of Building Performance Simulation, Vol. 5, No. 6, pp. 369-383. https://doi.org/10.1080/19401493.2011.652175
  9. Kong, D. S., Jang, Y. S., and Huh, J. H., 2014, A Multiobjective Optimization Method for Energy System Design Considering Initial Cost and Primary Energy Consumption, Korean Journal of Air-Conditioning and Refrigeration Engineering, Vol. 26, No. 8, pp. 357-365. https://doi.org/10.6110/KJACR.2014.26.8.357
  10. Cho, H. K., 2012, Structure Optimization FEA Code Development Under Frequency Constraints by Using Feasible Direction Optimization Method, Journal of the Korean Society of Manufacturing Technology Engineers, Vol. 22, No. 1, pp. 63-69. https://doi.org/10.7735/ksmte.2013.22.1.63
  11. Kim, E. J., 2014, Impact of different boundary conditions in generating g-function on the sizing of ground heat exchangers, Korean Journal of Air-Conditioning and Refrigeration Engineering, Vol. 26, No. 6, pp. 263-268. https://doi.org/10.6110/KJACR.2014.26.6.263