DOI QR코드

DOI QR Code

A Proposal to Improve Standardization Process on Defense R&D for Quality and Reliability of Missile System

유도무기체계 품질 및 신뢰성 제고를 위한 개발단계 국방규격화 프로세스 개선 방안

  • 조유습 (국방기술품질원 품질경영본부) ;
  • 김장은 (국방기술품질원 품질경영본부) ;
  • 윤재형 (국방기술품질원 품질경영본부) ;
  • 김시옥 (국방기술품질원 품질경영본부) ;
  • 이수림 (국방기술품질원 품질경영본부)
  • Received : 2017.07.28
  • Accepted : 2017.09.28
  • Published : 2017.09.30

Abstract

To achieve designed quality and reliability from R&D to force integration, an establishment of precise and distinct specifications and standards are required. However, the recent process of R&D standardization on defense acquisition system, has brought plenty of corrections on specifications and standards that may cause not only difficulties to production line and retardation to the military forces, but also a degradation of provided weapon systems. Therefore, a technical review should be performed by the developer, the producer, and the client, establishing the standard that include mass production requirements as well as clients' requirements. This paper propose a specified solution on process of R&D standardization, by applying a substantial FCA(Functional Configuration Audit) and PCA(Physical Configuration Audit) which implies participation of related agencies. By the improved PCA, 2,023 corrections on 74 types of QAR(Quality Assurance Requirement)s and 12,715 corrections on drawings are identified.

Keywords

References

  1. Republic of Korea, "DEFENSE ACQUISITION PROGRAM ACT", 2014.
  2. DAPA, "Defense Acquisition Program Administration Regulations", 2014.
  3. DAPA, "Knowledge Management Practice Guidelines Based on System Engineering", 2011.
  4. DTaQ Technical Report DTaQ-08-1823-R, 'A Study on Korean Defense Specification Practice Standard Development Initiative', 2008.
  5. DTaQ Technical Report DTaQ-14-4209-Q, 'The Report on the Initial Production Quality Assurance Activities for MSAM-1K Safety and Arming Device', 2014.
  6. DTaQ Technical Report DTaQ-15-4249-R, 'A Study of Estimating the Confidence Level According to the Hit Rate for PGM(Precision Guided Missile)', 2015.
  7. DTaQ Technical Report DTaQ-16-4072-R, 'A Study on the Fire Number Extraction and Confidence Level of Missile and Test Method', 2016.
  8. ADD Technical Report ADDR-516-111946, 'Result of the PCA of ${\bigcirc}{\bigcirc}$ Missile Round', 2011.
  9. ADD Technical Report ADDR-516-160474, 'Result of Physical Configuration Audit for ${\bigtriangleup}{\bigtriangleup}$ Missile System', 2016.
  10. INCOSE, "System Engineering Handbook. A guide for system life cycle process and activities", Fourth edition, Wiley, 2015
  11. Han et al. 'A Plan to Improve the Configuration Management Activity from System Development to Initial Production, to Increase Efficiency of the Defense Acquisition.' 2010 KIMST Conference.
  12. Cho et al. 'A Proposal to Improve Standardization Process on Defense R&D for Quality and Reliability of Weapon Systems.' 2016 KIMST Conference.
  13. Kim et al. 'A Study on The Mass Production Weapon System Parts Localization System Engineering Development Management Process Application based on ISO/IEC/IEEE 15288.' J Korean Soc Qual Manag Vol. 44, No.2:541-552, September 2016. https://doi.org/10.7469/JKSQM.2016.44.3.541

Cited by

  1. 무기체계 소프트웨어 규격화 누락여부 검증 방안 - 펌웨어 중심으로 vol.22, pp.3, 2017, https://doi.org/10.5762/kais.2021.22.3.310