Abstract
Recently, as the building construction works have been activated, the environment in which the excavation work is proceeding in parallel with the existing structure and the adjacent excavation work is increasing. However, there is not a lot of research on this. In this study, numerical analysis was carried out for interaction analysis between former excavation construction and follow-up excavation on two excavation retaining structures in parallel with excavation. As a result of numerical analysis, if the supporting load of strut is not considered, it was analyzed that the displacement distribution in the structure can be underestimated and acting stress of strut is overestimated. It was analyzed that the support stress causes by the former excavation should be considered in order to simulate the actual behavior characteristic.
최근 건축공사가 활성화됨에 따라 기존 구조물과의 근접한 공사 그리고 인접 굴착공사와 병행하여 굴착공사가 진행되는 환경이 증가하고 있지만 이에 대한 연구는 미흡한 실정이다. 본 연구에서는 두 개의 굴착 흙막이 구조물에 대해 기존 굴착 흙막이 구조물과 후속 굴착 흙막이 구조물 간의 상호작용 분석을 위해 수치해석을 수행하였다. 수치해석 분석결과 선행 굴착으로 인해 작용하는 지보재의 하중을 고려하지 않는 경우 구조물에 발생하는 변위는 과소평가 될 수 있는 것으로 분석되었고, 지보재에 작용하는 응력은 과하게 평가되어 실제 지반의 거동을 모사하기 위해서는 선행굴착으로 인해 발생하는 지보재 응력을 고려해야 하는 것으로 분석되었다.