DOI QR코드

DOI QR Code

Development of Construction Schedule Management System based on BIM

BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구

  • 박소현 ((사)빌딩스마트협회 기술연구소) ;
  • 송정화 (남서울대학교 건축학과) ;
  • 오건수 (남서울대학교 건축학과)
  • Received : 2016.10.31
  • Accepted : 2018.02.08
  • Published : 2018.03.30

Abstract

As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Keywords

Acknowledgement

Supported by : 중소기업청

References

  1. Jang, G. (2014). Improvement of Cost-Schedule integration using BIM based on Progress Management through PMIS, Thesis, Gachon University.
  2. Kim, H., Choi, J., & Kim, I. (2013). A Methodology of Open BIM-Based Quantity Take-off for Schematic Estimation of Frame Work in Super-Tall Buildings. Journal of Architectural Institute of Korea, 29(5), 31-38
  3. Lee, J.(2016). Implementation of Customized 4D and 5D System based on BIM. Journal of the Korea Academia-Industrial cooperation Society, 17(8), 55-61 https://doi.org/10.5762/KAIS.2016.17.8.55
  4. Kim, H., & Kang, I.(2016). Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost. Journal of Construction Engineering and Management, 17(5), 54-61
  5. Oh, K., Park, S., & Song, J. (2016). A Study on the Using of BIM Data and Template for Construction Progress Management. Journal of the Korea Academia-Industrial cooperation Society, 17(8), 157-163 https://doi.org/10.5762/KAIS.2016.17.8.157
  6. Park, S., Oh, K., & Song, J. (2015). A study on the Information for the Schedule Management of the Construction based BIM. Journal of Digital Contents Society, 16(4), 555-564 https://doi.org/10.9728/dcs.2015.16.4.555
  7. Lee, D., Cha, H., Kim, K., & Shin, D. (2015). Development of BIM-based Construction Document Information Database Information Database Structure through the Link to the BIM Model and Construction Document Information. Journal of Construction Engineering and Management, 16(5), 42-53
  8. Yoon, Y., Suh, S., Jang, G., & Choi, J. (2013). Improvement of Cost-Schedule integration based Progress Management through PMIS. Journal of Construction Engineering and Management, 14(5), 144-152
  9. Jung, J., & Chin, S. (2011). A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase. Journal of Construction Engineering and Management, 12(5), 23-34
  10. Lee, M., Lee, S., & Ock, J. (2011). A Study on the Development of the Property Information Modeling Methods for the Trades without Shape Information. Transaction of the Society of CAD/CAM Engineers, 16(2), 114-125
  11. Yoon, Y., Suk, S., Park, M., & Jang, M., (2008). Construction Process based Schedule Risk Management System. Journal of Construction Engineering and Management, 9(4), 101-110
  12. Lee, J., & Lee, G., (2013). About RTS-SAREK Program works through the BIM data extraction. The magazine of the Society of Air-conditioning Refrigeration Engineer of Korea, 42(4), 50-58
  13. Wang, X., Yung, P., Luo, H., & Truijens, M.(2014). "An innovative method for project control in LNG porject through 5D CAD:A case study." Automation in Constuction 45, pp.126-135 https://doi.org/10.1016/j.autcon.2014.05.011
  14. Ding, L., Zhou, Y., & Akinci, R.(2014). "Building Information Modeling(BIM) application framework:The process of expanding from 3D to computable nD." Automation in Constuction 46, pp.82-93 https://doi.org/10.1016/j.autcon.2014.04.009