DOI QR코드

DOI QR Code

The method to reduce the travel time of the gentry in (sLb-Camera-pLb) type

(sLb-Camera-pLb)타입의 겐트리 이동시간 단축 방법

  • Received : 2019.02.02
  • Accepted : 2019.04.20
  • Published : 2019.04.28

Abstract

The gantry of surface mount equipment (SMD) is responsible for transferring parts from the feeder to the PCB. At this time, the moving time of the gantry affects the yield. Therefore, in this paper, we propose the fastest path from the suction to the mounting to reduce the gantry travel time. This path is a case where the velocity in front of the camera is 2m/sec due to the nature of the gantry. Therefore, the trajectory graph of this case was created through simulation and the travel time was calculated. As a result, we can see that the moving time of the moving-motion method proposed in this paper is 20% shorter than the current stop-motion method.

표면실장장비(SMD)의 겐트리는 부품을 피더에서 기판으로 옮기는 역할을 한다. 이 때 겐트리의 이동 시간은 생산량에 영향을 미친다. 따라서 본 논문에서는 겐트리의 이동 시간을 단축시키기 위해 부품의 흡착에서 실장까지 가장 빠른 경로를 제시한다. 이 경로는 겐트리의 특성상 카메라 앞에서의 속도가 2인 경우이다. 따라서 이때의 궤적 그래프를 시뮬레이션을 통해 작성하고 이동 시간을 계산하였다. 그 결과 현재 사용 중인 stop-motion방법보다 본 논문에서 제시한 moving-motion방법의 이동 시간이 20%단축된 것을 알 수 있다.

Keywords

OHHGBW_2019_v10n4_39_f0001.png 이미지

Fig. 2. Velocity Graph

OHHGBW_2019_v10n4_39_f0002.png 이미지

Fig. 3. Modified Velocity Graph

OHHGBW_2019_v10n4_39_f0003.png 이미지

Fig. 4. Velocity Graph of the stop-motion method

OHHGBW_2019_v10n4_39_f0004.png 이미지

Fig.6. Velocity Graph

OHHGBW_2019_v10n4_39_f0005.png 이미지

Fig. 7. Velocity Graph of the moving-motion method

OHHGBW_2019_v10n4_39_f0006.png 이미지

Fig. 1. (sLb-Camera-pLb) type

OHHGBW_2019_v10n4_39_f0007.png 이미지

Fig. 5. Velocity Graph

Table 1. Given Condition

OHHGBW_2019_v10n4_39_t0001.png 이미지

Table 2. Comparison Table of stop-motion, moving-motion

OHHGBW_2019_v10n4_39_t0002.png 이미지

References

  1. J. S. Lee. (2016). Defect Classification of Components for SMT Inspection Machines. masters thesis. Chungbuk National University, Chungbuk
  2. C. H. Lee. (2015). Integrated path planning algorithm for SMT inspection machines considering inspection delay time. masters thesis. Chungbuk National University, Chungbuk.
  3. K. S. Han. (2014). Enhanced uniformity of Chip Mounter by Force control. masters thesis. AJu University, Geonggi.
  4. H. Y. Kim. (2008). Failure Mode and Effect Analysis (FMEA) for Manhattan defect of Flexible Printed Circuit Board in Surface Mount Technology. masters thesis. Myungji University, Geonggi.
  5. S. S. Jo. (2017). Microscopic Inspection Automation of Small Components on Avionics System using Digital Image Processing Technique. masters thesis. Hanseo University, Geonggi.
  6. Beyer. D. M. Dangl. & Wendler. P. (2018). A Unifying View on SMT-Based Software Verification. Journal of automated reasoning, 60(3), 299-305. https://doi.org/10.1007/s10817-017-9432-6
  7. Merkle. T. Gotzen. R. (2015). Millimeter-Wave Surface Mount Technology for 3-D Printed Polymer Multichip Modules. IEEE Transactions on Components, Packaging and Manufacturing Technology, 5(2), 201-206. https://doi.org/10.1109/TCPMT.2014.2387232
  8. Brandl. F. Brandt. F. C. Eberl. C. Geist, (2018). Proving the Incompatibility of Efficiency and Strategyproofness via SMT Solving Journal of the Association for Computing Machinery, 65(2), 188-195.
  9. Treichel. T. H. (2018). A Reliability Examination of Lead-free Quartz Crystal Products Using Surface Mount Technology Engineered for Harsh Environments. SMTA News and Journal of surface mount technology, 18(3), 39-47, 2005.
  10. S. H. Kim. C. S. Kim. (2017). The method of minimizing gantry driving time in surface mount. Cheonan: Kongju National University.
  11. S. H. Kim. C. S. Kim. (2018) The Method to reduce the driving time in (sLa-Camera-pRd)type, Journal of The Korea Convergence Society, 9(12), 1-7. DOI Number: 10.15207/JKCS.2018.9.12.001
  12. S. H. Kim. C. S. Kim. (2018) Comparing the placement time of Stop-motion and moving-motion Indian Journal of Public Health Research & Development, 9(8), 633-637. DOI Number: 10.5958/0976-5506.2018.00804.5
  13. S. H. Kim. C. S. Kim. (2017) A Confirmation of the minimum moving time to the stop-motion in the (sLa-Camera-pLa)type. KIPS Tr. Software and Data Eng. 6(5), 223-228. DOI Number: 10.3745/KTSDE.2017.6.5.223
  14. S. H. Kim. C. S. Kim. (2017) A Comparison of the moving time about gantry. KIPS Tr. Software and Data Eng. 6(3), 135-140. DOI Number: 10.3745/KTSDE.2017.6.3.135
  15. S. H. Kim. C. S. Kim. (2015) The most Efficient Path Algorithm from Feeders to PCBs. International Journal of Control and Automation, 8(9), 11-20. DOI Number: 10.14257/ijca.2015.8.9.02
  16. Y. M. Kim. C. S. Kim. (2015) Development of the Air Stick Feeder for Inserting the Relay. Journal of the Korea Academia-Industrial cooperation Society 16(2), 1398-1402. DOI Number:10.5762/KAIS.2015.16.2.1398