DOI QR코드

DOI QR Code

A Study on the Estimation of the Proper Price of Weapon System by Performance Factors: Focused on Heli-Launched Anti-Tank Guided Missiles

성능요인에 따른 무기체계 적정가격 추정방안 연구: 헬기발사형 대전차 유도무기를 중심으로

  • Park, Sanghyun (Global Market Intelligence Team, Defense Agency for Technology and Quality) ;
  • Kang, Eonbi (Department of Industrial and Systems Engineering, Gyeongsang National University) ;
  • Jeon, Jeonghwan (Department of Industrial and Systems Engineering, Gyeongsang National University)
  • 박상현 (국방기술품질원 해외시장분석팀) ;
  • 강언비 (경상대학교 산업시스템공학부) ;
  • 전정환 (경상대학교 산업시스템공학부)
  • Received : 2020.09.21
  • Accepted : 2021.01.29
  • Published : 2021.02.05

Abstract

In government procurement programs, cost estimation and analysis support funding decisions and are the basis for other major decisions, too. Such estimating and analyzing the cost of the weapon systems are crucial in execution of the defense budget. However, existing cost estimations and analyses have focused on domestic R&D projects, thus those are not valid in application to foreign weapon acquisitions. This study aims at foreign weapon systems that are acquired from Direct Commercial Sales. Because the data for price estimation of a foreign weapon is usually not available, we suggest a price estimation model based on performance factors of the weapon. In this study, the proper price of the weapon system is estimated using the parametric cost estimating model. Using the data of helicopter-launched anti-tank guided missiles worldwide, we analyze the effect of each performance factor on the weapon system price by regression analysis, and use step-wise and ridge regression analysis to remove multi-collinearity. This study hopefully contributes to more reasonable decision making on proper price of weapons.

Keywords

References

  1. Defense Acquisition Program Administration, "Defense Acquisition Program Statistical Yearbook," Seoul: DAPA, 2020.
  2. PIETER D. WEZEMAN, et al., "TRENDS IN INTERNATIONAL ARMS TRANSFERS, 2019," SIPRI Fact Sheet, 2020.
  3. H. Lee, K. Ha, S. Kwak, "Theory and Practice of Cost Analysis," Korea Institute for Defense Analyses, 2018.
  4. W. Eo, Y. Lee and S. Kang, "Developing an R&D CER Using Historical Defense Weapon System Data in Korea," Journal of Society of Korea Industrial and Systems Engineering, Vol. 33, No. 3, pp. 55-62, 2010.
  5. H. Lee, "The Right Understanding of Cost Analysis and Direction of Development," Defense Industry Policy Forum, 2002.
  6. J. Lee, et al., "Estimation of the RDT&E Cost of a Weapon System Using a Prior Elicitation Method (2nd step)," Agency for Defense Development, 2008.
  7. T. Sung, "Understanding and Application of Modern Basic Statistics," Hakjisa, 2017.
  8. S. Gwon, "Regression Analysis-based on Utilizing Statistical Software SAS.SPSS," Freedom Academy, 2010.
  9. Y. Lee, et al., "Development of R&D Cost Estimation Model for Missile System," Journal of the Korean Association of Defense Industry Studies, Vol. 19, No. 1, pp. 74-99, 2012.
  10. A. E. Hoerl, R. W. Kennard, "Ridge Regression: Biased Estimation for Nonorthogonal Problems," Technometrics, Vol. 12, pp. 69-82, 1970. https://doi.org/10.1080/00401706.1970.10488635
  11. G. Khalaf, G. Shukur, "Choosing Ridge Parameter for Regression Problems," Communications in Statistics - Theory and Methods, Vol. 34, No. 6, pp. 1177-1182, 2005. https://doi.org/10.1081/STA-200056836
  12. H. Kim, et al., "Korean Cost Analysis Computer Model User Education," Defense Acquisition Program Administration, 2017.
  13. J. Won, "A Study on Estimation Method for Reasonable Price using PRICE Model," Defense Agency for Technology and Quality, 2010.